Untitled item
S6W-13027 · Written Question · lodged by Bibby, Neil
The answer
Project/Organisation
Decision
Carbon Reduction – Adventure Centre for Education
Approved
Dunlop Dairy Cheese Shop & Tasting Room
Deferred
Disabled access plus Disabled Toilet and Additional Toilet – Hareshaw Community Hall SCIO
Approved
Renewable Energy Infrastructure to New Tourist Accommodation Development – Millport, Jack Alt Stays
Approved
Little Peru Green Start, Little Peru Ltd
Deferred
The Community Regeneration of Millport Town Hall Ltd
Rejected
Arran Green Funding for Future – Arran Pioneer CIC
Rejected
Gaiety on Tour – Ayr Gaiety Partnership
Approved
The Geisland Project – Beith CDT
Approved
Access to Community for All – Crossroads Community Hubs Ltd
Approved
Ailsa Craig Visitor Centre for Feasibility Study – Girvan Town Team (on behalf of Girvan Community Led Tourism)
Approved
Brand Ambassador/Distillery Production Assistant – Isle of Cumbrae Distiller
Approved
Paths Network Feasibility Study – Kirkimichael Village Renaissance
Deferred
Newmilns Regeneration Feasibility Study – Newmilns Regeneration Association
Deferred
Business Sustainability and Resilience Advisor – Visit Arran Ltd
Approved
Opportunities for All – Crossroads Community Hub Ltd
Approved
Where a project is noted as ‘deferred’ this means that a final decision by the LAG is pending.
The application for The Community Regeneration of Millport Town Hall Ltd was rejected due to:The lack of fit with the project itself (not completion of the town hall) and ARIA fund priorities. The Local Action Group considered the application did not make a strong enough link between the project and completion of the town hall to validate the priorities selected.There was concern over the fire safety aspects at such a late stage in the overall project.
The application for the Arran Green Funding for Future (Arran Pioneer CIC) was rejected due to:A lack of project outcomes being fully determined or specified.The Local Action Group questioned the eligibility of the project under the guidance requirement for technical/feasibility studies to fully determine the project outcome.
Answered by Mairi Gougeon on 23 Dec 2022.