Meeting of the Parliament 15 March 2016
The minister is convinced that that is how the system works and I am sure that it is. The problem is that there was a mismatch of expectations on both sides of the relationship.
It was an unforeseen problem, which we will have to deal with going forward. Many people lost money as a result of the problem—not least the transport industry, whose heavy goods vehicles had to take long routes to bypass the bridge right through to February. Those issues need to be addressed.
In the future, we will have two road bridges and there may be unforeseen problems. I am concerned that the design of the road network, which is being changed to suit the new bridge, might not be up to the job if anything went wrong and we had to divert traffic back on to the old bridge to avoid problems. Perhaps ministers should consider the road layout so that they can divert the traffic between bridges if such a problem occurs in the future.